[{"data":1,"prerenderedAt":370},["ShallowReactive",2],{"navigation":3,"\u002Fdocs\u002Fconstruction-progress-guide":40,"\u002Fdocs\u002Fconstruction-progress-guide-surround":365},[4,8,12,16,20,24,28,32,36],{"title":5,"path":6,"stem":7},"Getting started","\u002Fdocs\u002Fgetting-started","1.docs\u002F1.getting-started",{"title":9,"path":10,"stem":11},"Core concepts","\u002Fdocs\u002Fcore-concepts","1.docs\u002F2.core-concepts",{"title":13,"path":14,"stem":15},"Sales & CRM guide","\u002Fdocs\u002Fsales-crm-guide","1.docs\u002F3.sales-crm-guide",{"title":17,"path":18,"stem":19},"Construction progress guide","\u002Fdocs\u002Fconstruction-progress-guide","1.docs\u002F4.construction-progress-guide",{"title":21,"path":22,"stem":23},"Payments & collections guide","\u002Fdocs\u002Fpayments-guide","1.docs\u002F5.payments-guide",{"title":25,"path":26,"stem":27},"RERA compliance guide","\u002Fdocs\u002Frera-compliance-guide","1.docs\u002F6.rera-compliance-guide",{"title":29,"path":30,"stem":31},"Reports & exports","\u002Fdocs\u002Freports-and-exports","1.docs\u002F7.reports-and-exports",{"title":33,"path":34,"stem":35},"Roles & permissions","\u002Fdocs\u002Froles-permissions","1.docs\u002F8.roles-permissions",{"title":37,"path":38,"stem":39},"Frequently asked questions","\u002Fdocs\u002Ffaq","1.docs\u002F9.faq",{"id":41,"title":17,"body":42,"description":359,"extension":360,"meta":361,"navigation":362,"path":18,"seo":363,"stem":19,"__hash__":364},"docs\u002F1.docs\u002F4.construction-progress-guide.md",{"type":43,"value":44,"toc":349},"minimark",[45,50,59,81,88,97,101,108,140,143,147,155,159,162,194,197,201,204,296,299,303,306,321,324,332,336],[46,47,49],"h2",{"id":48},"activity-templates","Activity templates",[51,52,53,54,58],"p",{},"Progress tracking is built on ",[55,56,57],"strong",{},"activity templates"," — checklists of construction activities\ngrouped under RERA's standard progress categories (see below). Templates come in three scopes:",[60,61,62,69,75],"ul",{},[63,64,65,68],"li",{},[55,66,67],{},"Phase templates"," — for phase-level infrastructure and common areas (roads, compound wall,\nlandscaping, and similar shared works that don't belong to one building).",[63,70,71,74],{},[55,72,73],{},"Building templates"," — for building-level structural work (excavation, superstructure,\nstaircases and lifts, external works, and so on).",[63,76,77,80],{},[55,78,79],{},"Unit templates"," — for work done inside individual flats or units (internal plaster and\nflooring, sanitary fittings, fixtures).",[51,82,83,84,87],{},"Templates are set up once by an administrator (under Settings → Progress Templates) and then\n",[55,85,86],{},"applied"," wherever tracking needs to start. You don't need to build a checklist from scratch\nfor every phase or building — pick a template and Construvex creates the progress records for\nyou.",[89,90,91],"blockquote",{},[51,92,93,96],{},[55,94,95],{},"Note:"," Editing the activities inside a template is an admin task. This guide covers using\ntemplates to start tracking progress, not building or editing them.",[46,98,100],{"id":99},"initializing-progress-tracking","Initializing progress tracking",[51,102,103,104,107],{},"Before you can record any progress, a phase, building, or unit needs to be ",[55,105,106],{},"initialized"," from a\ntemplate:",[109,110,111,122,137],"ol",{},[63,112,113,114,117,118,121],{},"Open the phase's ",[55,115,116],{},"Phase progress"," page (or a building's ",[55,119,120],{},"Building progress"," page).",[63,123,124,125,128,129,132,133,136],{},"If nothing has been tracked yet, you'll see an initializer prompting you to pick a template —\na ",[55,126,127],{},"Phase Infrastructure Template"," for phase-level common works, or a ",[55,130,131],{},"Building Template","\nand\u002For ",[55,134,135],{},"Unit Template"," for a specific building.",[63,138,139],{},"Select the template(s) you want and confirm. Construvex creates one progress record per\nactivity in the template, ready to be updated.",[51,141,142],{},"Buildings that haven't been initialized yet, or that are missing a unit template, are flagged\nwith an attention banner on the phase progress page so nothing gets missed.",[144,145],"screenshot",{"id":146},"progress-tracking",[89,148,149],{},[51,150,151,154],{},[55,152,153],{},"Tip:"," Initialize buildings as soon as they're added to a phase, even before construction\nstarts. It's easier to track from day one than to backfill activity history later.",[46,156,158],{"id":157},"recording-progress","Recording progress",[51,160,161],{},"Once activities exist, update them from the phase or building progress page:",[60,163,164,170,176,182,188],{},[63,165,166,169],{},[55,167,168],{},"Status"," — activities move through in-progress and completed states as work happens on\nsite.",[63,171,172,175],{},[55,173,174],{},"Evidence"," — some activities require photo evidence before they can be marked complete; you'll\nbe prompted to upload photos (with optional tags) at that point.",[63,177,178,181],{},[55,179,180],{},"Notes"," — add context to any status update.",[63,183,184,187],{},[55,185,186],{},"Bulk updates"," — select multiple activities at once (for example, all activities on a floor)\nand update or mark them complete together.",[63,189,190,193],{},[55,191,192],{},"Approval"," — some activities are configured to require approval before a \"completed\" update\ncounts toward the official percentage. In that case, updating the activity submits an approval\nrequest instead of completing it immediately; once approved, it's reflected in the numbers.",[51,195,196],{},"Building progress pages offer a few ways to view and update activities depending on what you're\nlooking at: an overall summary, a detailed activity list, a heatmap-style matrix, and — for\nbuildings tracked floor by floor — a floor-wise view with an elevation diagram so you can see and\nupdate status floor by floor or unit by unit.",[46,198,200],{"id":199},"rera-progress-categories","RERA progress categories",[51,202,203],{},"Every activity belongs to one of RERA's standard construction categories, so your progress always\nmaps back to the categories authorities expect in compliance filings:",[205,206,207,220],"table",{},[208,209,210],"thead",{},[211,212,213,217],"tr",{},[214,215,216],"th",{},"Category",[214,218,219],{},"Covers",[221,222,223,232,240,248,256,264,272,280,288],"tbody",{},[211,224,225,229],{},[226,227,228],"td",{},"Excavation",[226,230,231],{},"Site preparation, excavation, and foundation groundwork",[211,233,234,237],{},[226,235,236],{},"Plinth",[226,238,239],{},"Plinth construction and ground-level work",[211,241,242,245],{},[226,243,244],{},"Stilt Floor",[226,246,247],{},"Stilt\u002Fparking floor structure and finishing",[211,249,250,253],{},[226,251,252],{},"Super Structure Slabs",[226,254,255],{},"Columns, beams, and floor slabs",[211,257,258,261],{},[226,259,260],{},"Internal Works",[226,262,263],{},"Internal walls, plaster, flooring, doors and windows within a unit",[211,265,266,269],{},[226,267,268],{},"Sanitary Fittings",[226,270,271],{},"Sanitary fittings within a unit",[211,273,274,277],{},[226,275,276],{},"Staircases, Lifts & Lobbies",[226,278,279],{},"Staircases, lift wells, lobbies, and water tanks",[211,281,282,285],{},[226,283,284],{},"External Works",[226,286,287],{},"External plumbing, external plaster, elevation, terraces",[211,289,290,293],{},[226,291,292],{},"Installation & Finishing",[226,294,295],{},"Lifts, pumps, fire-fighting, electrical, and final finishing",[51,297,298],{},"Each category shows its own percentage alongside the overall figure, so you can see, for\ninstance, that a building is fully done with excavation and plinth but still mid-way through\ninternal works.",[46,300,302],{"id":301},"how-progress-rolls-up-the-hierarchy","How progress rolls up the hierarchy",[51,304,305],{},"Progress recorded at the unit and building level aggregates automatically:",[60,307,308,313,318],{},[63,309,310,312],{},[55,311,120],{}," combines its building-scope activities with the average of its units'\nprogress for categories that apply to both (internal works, for example).",[63,314,315,317],{},[55,316,116],{}," combines the average of all buildings in the phase with phase-level\ninfrastructure progress, weighted so building work carries most of the weight and shared\ninfrastructure the rest.",[63,319,320],{},"The phase progress page shows the overall percentage, a per-building breakdown, and applicable\nRERA categories for each building — so you can drill from a phase-wide number down to the exact\nactivity holding a building back.",[51,322,323],{},"Percentages recalculate as activities are updated, so the numbers you see on any level are always\ncurrent as of the last update.",[89,325,326],{},[51,327,328,331],{},[55,329,330],{},"Warning:"," Progress that's still waiting on approval doesn't count toward the percentage yet.\nIf a number looks lower than you expect, check whether recent updates are pending approval.",[46,333,335],{"id":334},"exporting-progress-and-finding-reports","Exporting progress and finding reports",[51,337,338,339,344,345,348],{},"Phase and building progress pages can be exported to CSV directly from the page for quick sharing\nor offline review. For the formal, point-in-time reports used in RERA quarterly filings —\ngenerated from a snapshot of progress at that date, with Excel export — see the\n",[340,341,343],"a",{"href":342},".\u002Freports-and-exports","Reports & exports guide",". For how progress connects to RERA configuration,\nescrow, and OC\u002FCC tracking, see the ",[340,346,25],{"href":347},".\u002Frera-compliance-guide",".",{"title":350,"searchDepth":351,"depth":351,"links":352},"",2,[353,354,355,356,357,358],{"id":48,"depth":351,"text":49},{"id":99,"depth":351,"text":100},{"id":157,"depth":351,"text":158},{"id":199,"depth":351,"text":200},{"id":301,"depth":351,"text":302},{"id":334,"depth":351,"text":335},"Track real construction work — from setting up activities to seeing roll-up percentages at every level of the Project → Phase → Building → Unit hierarchy.","md",{},true,{"title":17,"description":359},"6If3xSG4w6z41YCCDVbErtm4PEJD22Rqb5oSdFa7mao",[366,368],{"title":13,"path":14,"stem":15,"description":367,"children":-1},"This guide walks through the day-to-day sales workflow in Construvex: finding or adding a customer, opening a deal on an available unit, moving that deal through its stages, and seeing how a booked unit hands off to its payment plan.",{"title":21,"path":22,"stem":23,"description":369,"children":-1},"Set up payment plans, generate a collection schedule when a unit is booked, and track what's been received against what's due.",1784127113510]